A General Works

 

 

Internal Floor Area

item

The internal floor area of a building including any upper or lower floors.

1 Site Preparation

 

 

a) Protect Existing Tree

item

Any fence protection etc.

b) Remove Shrubs / Plants etc

item

As described.

c) Remove Existing Structures

m2

Based on single storey measured by the floor area including loading into skip 20 meters away.

d) Demolish Dwarf 100mm Walls

m2

As described including loading into skip 20 meters away. Multiply by 2 for 200mm wall etc.

e) Lift Existing Paving

m2

As described including loading into skip 20 meters away.

f) Break Up & Remove Concrete Slab

m2

As described including loading into skip 20 meters away.

g) Break Up & Remove Concrete (m3 rate)

m3

Includes wheel and load all into skip 20 meters away, "Note m3 rate".

 

 

 

2 Alterations / Demolition

 

 

a) Strip Out Fittings

item

Removal of any items prior to works being able to commence.

b) Electrical Disconnection To Area

item

To make working area safe.

c) Plumbing Disconnection To Area

item

To make working area safe.

d) Scaffolding / Props etc

item

Safe working items.

e) Strip Out Single Internal Door / Lining / Architrave

per

Single doorway as described including loading into skip 20 meters away.

f) Strip Out Skirting Boards

Lm

As described including loading into skip 20 meters away.

g) Remove Timber Stud Walling & Plasterboard

m2

As described including Plasterboard from both sides & loading into skip 20 meters away.

h) Remove 100mm Brick / Blockwork Walling

m2

As described including loading into skip 20 meters away.

i) Remove External Windows / Doors / Frames

m2

As described including loading into skip 20 meters away.

j) Remove Roof Tiles & Roof Spar Timbers

m2

As described including loading into skip 20 meters away.

k) Remove Ceiling Spars / Insulation / Plasterboard

m2

As described including loading into skip 20 meters away.

l) Remove Floorboarding / Joists / Plasterboard Ceiling

m2

As described including loading into skip 20 meters away.

m) Remove Cavity Walling & Insulation

m2

Based on outer brickwork and inner blockwork including loading into skip 20 meters away.

n) Remove Concrete Floor Slab (max 150mm)

m2

As described including loading into skip 20 meters away.

o) Remove Brickwork / Blockwork Foundation & Concrete

Lm

Based on 100mm inner & outer solid blockwork including 100mm concrete cavity fill to a depth of 750mm. Concrete strip foundations of 1 x 0.7 x 0.225 all including loading into skip 20 meters away.

p) Make Good To Any Remaining Structures

item

As described.

q) Internal Timber Safety Screen (faced with plywood)

m2

Safety screen to enclose working area.

 

 

 

3 Foundations

 

 

a) Reduce Dig Site Area (200mm deep)

m2

Original site area assumed to be 150mm lower than the existing finished floor level reduce area by 200mm equates to 350mm below floor level.

b) Set Out Building

item

As described.

c) Excavate Foundation Trenches (700mm wide x 900mm deep)

Lm

Hand excavate foundation trench 1m long by 700mm wide by 900mm deep from original ground level including wheel and load spoil into skip 20 meters away (retaining approx 30% for back fill).

d) Concrete Foundation Trenches (700mm wide x 225mm deep)

Lm

Includes wheel to area 20 meters away, spred and level.

e) Build Cavity Foundation (using standard concrete blocks)

Lm

Build up 675mm (3 courses) high blockwork to both inner and outer leafs with a further two courses of common brick topping the inner leaf.

f) Build Cavity Foundation (using trench blocks)

Lm

Build up 675mm (3 courses) high blockwork with a further two courses of common bricks to the inner side.

g) Build 225mm Foundation (using standard concrete blocks)

Lm

Build up 675mm (3 courses) high blockwork to both inner and outer leafs with a further two courses of common brick topping to both leafs.

h) Build 100mm Foundation (using standard concrete blocks)

Lm

Build up 675mm (3 courses) high blockwork with a further two courses of common brickwork topping.

i) A142 Reinforcement (3.6m x 2m sheets)

m2

As described.(include for lapping)

j) Cutting Reinforcement

item

As described.

k) Under Slab Services

item

As described.

l) Concrete Lintels - P.C.C 100 x 75 x 600 (Over drains/services)

each

As described.

Additions

 

 

m) Reduce Dig Site Area (m3 rate)

m3

Includes wheel and load into skip 20 meters away. "Note m3 rate"

n) Standard Excavation Not Exceeding 900mm Deep (m3 rate)

m3

Includes wheel and load into skip 20 meters away, retaining approx 30% for back fill. "Note m3 rate"

o) Excavation Below Standard 900mm Dig (m3 rate)

m3

Includes wheel and load all into skip 20 meters away. "Note m3 rate"

p) Concrete To Foundation Trenches (m3 rate)

m3

Includes wheel to area 20 meters away, spred and level. "Note m3 rate"

q) 100mm 7N Foundation Blockwork (m2 rate)

m2

As described. "Note m2 rate"

r) 300mm Trench Blocks (m2 rate)

m2

As described. "Note m2 rate"

s) 100mm Foundation Common Brickwork (m2 rate)

m2

As described. "Note m2 rate"

t) Tie Wires - 6no per m2 (m2 rate)

m2

As described. "Note m2 rate"

 

 

 

4 Floor Slab

 

 

a) Concrete Cavity Fill

Lm

Includes wheel to area 20 meters away, spred and level.

b) Back Fill Foundation Trenches

Lm

Back fill exposed trenches with retained spoil.

c) Hardcore To Sub-Base (150mm deep)

m2

Includes load and wheel to area 20 meters away. Spread, level and compact into single layer.

d) Sand Blinding (50mm)

m2

Includes load and wheel to area 20 meters away. Spread and level.

e) D.P.M - Heavy Duty Membrane

m2

As described including fitting.

f) 50mm TF 70 Floor Insulation

m2

As described including fitting.

g) 75mm TF 70 Floor Insulation

m2

As described including fitting.

h) 100mm TF 70 Floor Insulation

m2

As described including fitting.

i) Perimeter Upstand Insulation (25mm x 200mm strips)

m2

As described including fitting.

j) Concrete Floor Slab (120mm thick)

m2

Includes wheel to area 20 meters away, spred and level.

k) A142 Reinforcement (3.6m x 2m sheets)

m2

As described.(include for lapping)

l) Cutting Reinforcement

item

As described.

Additions

 

 

m) Concrete Cavity Fill (m3 rate)

m3

Includes wheel to area 20 meters away, spred and level. "Note m3 rate"

n) Back Fill Foundation Trenches (m3 rate)

m3

Back fill exposed trenches with retained spoil. "Note m3 rate"

o) Hardcore To Sub-Base (m3 rate)

m3

Includes load and wheel to area 20 meters away. Spread, level and compact into 150mm layers. "Note m3 rate"

p) Sand Blinding (m3 rate)

m3

Includes load and wheel to area 20 meters away. Spread and level. "Note m3 rate"

q) Concrete Floor Slab (m3 rate)

m3

Includes wheel to area 20 meters away, spred and level. "Note m3 rate"

 

 

 

5 Drainage

 

 

a) Excavate/Pipe/Bend/Bedding/ Back Fill.(average 600mm deep)

Lm

Excavate trench 1metre long by 500mm wide by 600mm deep including wheel and load spoil into skip 20 meters away (retaining 70% for back fill) lay pipe including allowance for bend or coupler, 50mm gravel bedding/topping & surround including back fill of retained spoil.

b) Inspection Chamber - 460mm dia PVCu (600mm deep)

each

Installing base / cover / 2 risers & seals.

c) Gully's

each

Including allowance for bend / coupler and installing.

d) Soak-a-Ways (1 m³)

each

Excavate soak-a-way 1 meter cube including wheel and load spoil into skip 20 meters away (retaining 15% for back fill) fill with clean stone, top off with DPM and cover with 150mm top soil.

e) Connect To Existing Man-Hole

each

Including breaking into existing man-hole and making good after.

f) Concrete Cover Protection

Lm

Includes wheel to area 20 meters away, spred and level 100mm deep.

g) Divert Existing Drainage

item

As described.

h) Reinstate Area After

each

As described.

 

 

 

6 Super Structure

 

 

a) Face work up to D.P.C

Lm

Including loading and laying 3no course below D.P.C (65mm bricks).

b) D.P.C Horizontal

Lm

Including loading and laying as described.

c) ThermaClose "Vertical Window & Door Reviles"

Lm

Including loading and fitting as described.

d) D.P.C Cavity Trays

Lm

Including loading / laying and installing weep vents as described.

e) Tie To Existing Wall

Lm

Including toothing existing outer skin and fitting universal wall starters to the inner skin.

f) Cavity Walling (Brickwork / Blockwork)

m2

Including loading and laying outer 65mm pointed brickwork, forming cavity, tie-wires and inner blockwork.

g) Cavity Walling (Block / Block) ready for render

m2

Including loading and laying outer blockwork, forming cavity, tie-wires and inner blockwork.

h) Cavity Wall Insulation (100mm Iso Wool)

m2

Including loading and fitting as described. "see retaining clips below if required"

i) Cavity Wall Insulation (75mm Iso Wool)

m2

Including loading and fitting as described. "see retaining clips below if required"

j) Cavity Wall Insulation (50mm Quinntherm board)

m2

Including loading and fitting as described. "see retaining clips below if required"

k) Cavity Wall Insulation "Tie-Wire Retaining Clips"

m2

As described.

l) 4" Single Brickwork (Facework)

m2

Including loading and laying 65mm pointed brickwork.

m) 9" Brickwork (Faced Both Sides)

m2

Including loading and laying two skins of 65mm pointed brickwork.

n) 4" Single Blockwork

m2

Including loading and laying standard blockwork.

o) 9" Blockwork (2no 4" skins)

m2

Including loading and laying two skins of standard blockwork.

p) 9" Brickwork / Blockwork

m2

Including loading and laying 65mm pointed brickwork and a skin of standard blockwork.

 

 

 

7 Lintels / Steel Beams

 

 

a) External (100mm Cavity) Lintel with Arch-former Above

Lm

As described "labour included within brick/blockwork rate".

b) External (100mm Cavity) Lintels

Lm

As described "labour included within brick/blockwork rate".

c) External Arch Formers

Lm

As described "labour included within brick/blockwork rate".

d) Internal (100mm)Box Lintels (100 type) Load Bearing

Lm

As described "labour included within brick/blockwork rate". use as a rate for internal steel beams.

e) Internal (100mm) Lintels (none load bearing)

Lm

As described "labour included within brick/blockwork rate".

f) Garages - 9" Lintels (Box 200 type)

Lm

As described "labour included within brick/blockwork rate".

g) Garages - 4" Lintel (L10)

Lm

As described "labour included within brick/blockwork rate".

h) Cranage

item

May be required for lifting large beams into place.

 

 

 

8 Timber Floor Joists

 

 

a) Floor Joists (225x50xC16)

Lm

Including fitting and leveling.

a1) Floor Joists (225x75xC16)

Lm

Including fitting and leveling.

b) Notch into web of steel

each

As described.

c) Joist Hangers (ADJ type)

each

As described.

c1) Joist Hangers (Built In type or cut out pockets)

each

Including cutting out brick joint and fitting hanger, alternatively cutting pocket into brickwork.

d) Solid Strutting (200x50xC16)

Lm

As described.

e) Restraint Straps (Galv Strap Bent Once 1500mm Long)

each

As described. "noggins within joinery 1st fix"

f) Nuts/Bolts/Washers (say 180mm M12 Cup Square)

each

As described.

g) Battens (temporary strutting)

bundle

As described.

i) Fixings (nails / screws etc)

rate

As described.

 

 

 

9 Roof Carcasing

 

 

a) Strip Back Main Roof For Tie In

item

Including stripping existing tiles / underlay and exposing working area.

b) Tie to existing Roof

item

Forming new tie in and valleys.

b1) Layboard & Valley noggins for the above(say 200x25&50x50)

Lm

As above

c) Wallplate (say 75x100xC16)

Lm

Including cutting and jointing.

d) Wallplate Straps (Galv Strap Bent Once 1200mm Long)

each

For the above.

e) Ridge (say 50x200xC16)

Lm

As described.

e1) Poleplate (lean to ridge screwed to existing wall)

Lm

As described.

f) Hips (say 75x225xC16)

Lm

As described.

g) Valley Rafters (say 75x225xC16)see below for noggin & lay board

Lm

As described.

h) Perlins (say 75x225xC16)

Lm

As described.

i) Rafters (100x50xC16)

Lm

As described.

i1) Rafters (125x50xC16)

Lm

As described.

i2) Rafters (150x50xC16)

Lm

As described.

i3) Rafters (175x50xC16)

Lm

As described.

j) Rafter / Ceiling binder & hanger (say 100x50xC16)

Lm

As described "used as a horizontal binder and a vertical hanger for strengthening purposes".

k) Ceiling Spars (100x50XC16)

Lm

As described.

k1) Ceiling Spar Support (50x50 screwed to wall)

Lm

As described "fixed to the existing wall to support new ceiling spars".

l) Ceiling Spars (150x50xC16)

Lm

As described.

l1) Ceiling Spar Support (75x50 screwed to wall)

Lm

As described "fixed to the existing wall to support new ceiling spars".

m) Ceiling Hangers (say 100x50xC16)

Lm

As described.

n) Truss Kit (Including Clips)

item

As described "supplied by specialist supplier".

o) Standard Trusses (Measured Wallplate To Wallplate)

Lm

As described "labour only to fit specialist supplied kit".

p) Attic Trusses (Measured Wallplate To Wallplate)

Lm

As described "labour only to fit specialist supplied kit".

q) Valley Set (diminishing trusses)

set

As described "labour only to fit specialist supplied kit".

r) Truss Clips (2no per truss)

each

As described "labour only to fit specialist supplied kit".

s) Bracing (say 4"x1")

Lm

As described.

t) Cranage

item

As described "To lift roof trusses into place".

u) Fascia / Soffit / Soffit Vent / Tilt / Eaves Vent

Lm

As described "including 50 x 50 fixed to wall for soffit board support / fixing".

v) Gable Ladder & Barge

Lm

As described.

w) Box Ends (fascia returns & fascia to barge ends)

each

As described.

x) Valley Boards & Noggin

Lm

As described.

y) Box Gutter

each

As described.

z) Chimney Back

each

As described.

aa) Restraint Straps(Gables & Ceiling)Galv Strap Bent Once 1500mm Long

each

As described. "noggins within joinery 1st fix".

bb) Nuts/Bolts/Washers (say 180mm M12 Cup Square)

each

As described.

cc) Roof Light / Window (including flashings)

m2

As described.

dd) Fixings (nails /screws etc)

rate

As described.

 

 

 

10 Remedial / Alterations

 

 

a) Cut Out 100mm Brickwork (including prop / pin / lintel)

m2

As described "including wheel and load rubble into skip 20 meters away".

b) Cut Out 100mm Blockwork (including prop / pin / lintel)

m2

As described "including wheel and load rubble into skip 20 meters away".

c) Cut Out Cavity Walling (including prop / pin / lintel)

m2

As described "including wheel and load rubble into skip 20 meters away".

d) Cut Out & Replace Single Brick

each

As described "including wheel and load rubble into skip 20 meters away".

e) Cut Out & Rebuild Small Brickwork Areas (include tooth & bond)

m2

As described "including wheel and load rubble into skip 20 meters away".

f) Cut Out & Rebuild Brick Wall Sections (include tooth & bond)

m2

As described "including wheel and load rubble into skip 20 meters away".

g) Pointing

m2

As described "including raking out".

h) Pointing (Isolated areas not exceeding 1 m²)

m2

As described "including raking out".

i) Temporary internal screen (faced with 1200g visqueen)

m2

As described "including timber uprights at 600¢, base / head timbers and 1no mid span noggin".

 

 

 

11 External Doors

 

 

11a) Front Single Door with Mobility Threshold Frame

 

 

a) Door Frame (single mobility)

each

As described "including joiner fitting".

b) Doors (joiner swing door)

each

As described "including joiner fitting".

c) 4" Butt Hinges (3no)

3no

As described "joiner fitting included in door price above".

d) Sach Lock (5 lever mortise lock)

each

As described "including joiner fitting".

e) Handles (lever handles)

set

As described "including joiner fitting".

f) Letter Plate

each

As described "including joiner fitting".

g) Letter Plate Rear Tidy

each

As described "including joiner fitting".

h) Chub Security Bolts (2no)

2no

As described "including joiner fitting".

i) Chub Security Bolts (Keys)(2no)

2no

As described.

j) Glass

item

As described.

 

 

 

11b) Rear Timber Single Door With Weather Stripped Frame

 

 

a) Door Frame Weather Stripped (single rear door)

each

As described "including joiner fitting".

b) Doors (joiner swing door)

each

As described "including joiner fitting".

c) 4" Butt Hinges (3no)

3no

As described "joiner fitting included in door price above".

d) Sach Lock (5 lever mortise lock)

each

As described "including joiner fitting".

e) Handles (lever handles)

set

As described "including joiner fitting".

f) Macclesfield Cill (single)

each

As described "including joiner fitting".

g) Chub Security Bolts (2no)

2no

As described "including joiner fitting".

h) Chub Security Bolts (Keys)(2no)

2no

As described.

i) Glass

item

As described.

 

 

 

11c) Double Timber Door Sets

 

 

a) Door Frame (double - suit pair of doors)

each

As described "including joiner fitting".

b) Doors (joiner swing doors)

pair

As described "including joiner fitting".

c) 4" Butt Hinges (6no)

6no

As described "joiner fitting included in door price above".

d) Rebate Doors

set

As described.

e) Sach Lock (5 lever mortise lock)

each

As described "including joiner fitting".

f) Rebated Components (double doors)

each

As described "including joiner fitting".

g) Handles (lever handles)(2no pairs)

2 pair

As described "including joiner fitting".

h) Macclesfield Cill (double)

each

As described "including joiner fitting".

i) Chub Security Bolts (4no)

2no

As described "including joiner fitting".

j) Chub Security Bolts (Keys)(4no)

4no

As described.

k) Glass

4no

As described.

 

 

 

11d) External PVCu Doors / Frame

 

 

a) Single Door Set

m2

As described "including joiner fitting".

b) Opening French Doors

m2

As described "including joiner fitting".

c) Sliding Patio Doors

m2

As described "including joiner fitting".

 

 

 

12 External Windows

 

 

a) Softwood "Casement Window" (factory glazed - clear)

m2

As described "including joiner fitting".

b) Softwood "Casement Window" (frame only)

m2

As described "including joiner fitting".

c) Glazing

m2

As described "including joiner fitting".

d) PVCu "Casement Window" (factory glazed - clear)

m2

As described "including joiner fitting".

 

 

 

13 External Frame Sealant

 

 

a) Seal Frames (both sides including head & base)

Lm

As described.

 

 

 

14 Joinery 1st Fix

 

 

a) Chipboard Flooring (22mm V313 - T&G)

m2

As described "including joiner fitting".

a1) T&G Floor Boarding (softwood 150x25)

m2

As described "including joiner fitting".

b) Stairs

rate

As described "including joiner fitting" assess on site.

c) Noggin

Lm

As described "including joiner fitting".

d) Studding (50 x 75 scant)

Lm

As described "including joiner fitting".

e) Windowboards (25 x 225 pine)

Lm

As described "including joiner fitting".

f) 110mm casings (full set fixed to timber stud - 5.2 Lm per set)

set

As described "including joiner fitting".

g) 110mm casing leg (3no req per double door set - 2.1 Lm per leg)

leg

As described "including joiner fitting" note 3no required for a double door frame.

h) 150mm casings (full set fixed to blockwork - 5.2 Lm per set)

set

As described "including joiner fitting".

i) 150mm casing leg (3no req per double door set - 2.1 Lm per leg)

leg

As described "including joiner fitting" note 3no required for a double door frame.

j) Loft Hatch (750mm²)

each

As described "including joiner fitting".

k) Kingspan Insulation (100mm to sloping ceilings)

m2

As described "including joiner fitting".

l) Kingspan Insulation (75mm to sloping ceilings)

m2

As described "including joiner fitting".

m) Pre-Plaster Boxings (steel / S.V.P etc)

item

As described.

n) Alterations To Existing Building

item

As described.

p) Fixings (nails /screws etc)

rate

As described.

 

 

 

15 Joinery 2nd Fix

 

 

a) Architrave (single door both sides)

set

As described "including joiner fitting" note includes both sides.

a1) Architrave (double doors both sides)

set

As described "including joiner fitting" note includes both sides.

b) Skirting Board (125mm)

Lm

As described "including joiner fitting".

b1) Skirting Board (150mm)

Lm

As described "including joiner fitting".

b2) Skirting Board (175mm)

Lm

As described "including joiner fitting".

c) Alterations To Existing Building

item

As described.

d) Fixings (nails /screws etc)

rate

As described.

 

 

 

16 Internal Doors

 

 

16a) Single Standard Door

 

 

a) Door (joiner swing door)

each

As described "including joiner fitting".

b) 3" Loose Pin Hinges

3no

As described "joiner fitting included in door price above".

c) 2.5" Mortise Latch

each

As described "including joiner fitting".

d) Handle Set

set

As described "including joiner fitting".

 

 

 

16b) Bathroom Door

 

 

a) Door (joiner swing door)

each

As described "including joiner fitting".

b) 3" Loose Pin Hinges

3no

As described "joiner fitting included in door price above".

c) Bathroom Lock

each

As described "including joiner fitting".

d) Privacy Handle Set

set

As described "including joiner fitting".

 

 

 

16c) Double Doors

 

 

a) Doors (joiner swing doors)

2no

As described "including joiner fitting".

b) 3" Loose Pin Hinges

6no

As described "joiner fitting included in door price above".

c) 2.5" Mortise Latch

each

As described "including joiner fitting".

d) Rebated Component Set

each

As described "including joiner fitting".

e) Handles (2 sets)

2 sets

As described "including joiner fitting".

e) Chub Bolts

2no

As described "including joiner fitting".

f) Chub Bolt Knobs or Keys

2no

As described.

 

 

 

17 Loft Insulation

 

 

a) 250mm Insulation (one 150mm layer & one 100mm layer)

m2

As described.

 

 

 

18 Final Fix

 

 

a) Boxings

Lm

As described "including joiner fitting".

b) Sealant (baths / showers / kitchens)

Lm

As described "including joiner fitting".

c) Fixing Shower Screens/Panels etc

item

As described.

d) Alterations To Existing Building

item

As described.

f) Fixings (nails /screws etc)

rate

As described.

 

 

 

Description

Unit

Summary

B Subcontract

 

 

1 External Scaffolding

 

 

a) Single Storey - 1no lifts Total

Lm

As described.

b) Double Storey - 3no lifts Total (2 lifts brickwork - 1 lift roof)

Lm

As described.

c) Table Lifts for Gables

each

As described.

 

 

 

2 Roofing (scaffolding assumed to be supplied by main contractor)

 

 

(Plain Tiles - 100mm gauge)

 

 

a) Underlay & Batten (25x38 Tanalized)

m2

As described.

b) Tiling

m2

As described.

c) Eaves Tiles & Felt

Lm

As described.

d) Verge/undercloak/pointing/til&half

Lm

As described "note tile & half fitted in alternative rows".

e) Top Tiles (pole-plate level - single row / one side)

Lm

As described "note rate for single side, double up for return ridge".

(Modern Tiles - 75mm head lap)

 

 

f) Underlay & Batten (25x38 Tanalized)

m2

As described.

g) Tiling

m2

As described.

h) Eaves Felt

Lm

As described.

i) Verge/undercloak/pointing.

Lm

As described.

j) Marley Modern (verge clip)

each

As described.

k) Marley Modern (tile clip & nails)

each

As described.

(General Roofing Items)

 

 

l) Ridge (Capped Angular)

Lm

As described.

m) Valleys GRP (large tiles only i.e. Moderns)

Lm

As described.

n) Hip Tiles (Capped Angular)

Lm

As described.

o) Hip Irons - 4mm

each

As described.

p) General Cutting

Lm

As described.

 

 

 

3 Lead Work (scaffolding assumed to be supplied by main contractor)

 

 

a) Valleys (15" or 380mm Lead) small plain tiles & slate

Lm

As described "note pointing covered in builders associated work below" .

b) Plain Tile Soakers (6" or 150mm Lead cut to 10" x 6")

Lm

As described.

c) Plain Tile Cover Flashings (9" or 225mm Lead)

Lm

As described "note pointing covered in builders associated work below".

d) Modern Tile Cover Flashings (12" or 300mm Lead)

Lm

As described "note pointing covered in builders associated work below".

e) Stepped Flashing (9" or 225mm Lead)

Lm

As described "note pointing covered in builders associated work below".

 

 

 

4 Rainwater Guttering & Down Pipes

 

 

(Guttering)scaffolding assumed to be supplied by main contractor

 

 

a) 112.5mm Half Round UPVc (including brackets @ 900 ¢)

Lm

As described.

b) External Stop Ends

each

As described.

c) 90° Angle

each

As described.

d) 135° Angle

each

As described.

e) Running Outlet

each

As described.

f) Union Bracket

each

As described.

(Down Pipes)

 

 

a) Round 68mm dia PVCu (including brackets @ 1200 ¢)

Lm

As described.

b) Top Swan Neck (2no 112.5° offset bends)

set

As described.

c) Pipe Connector

each

As described.

d) 112.5° Branch

each

As described.

e) Shoe

each

As described.

 

 

 

5 Plastering

 

 

(Ceilings)

 

 

a) Standard 12.5mm Boarded Ceiling / Skimming

m2

As described.

b) 12.5mm Plasterboard (Vapor Check Foil Backed"duplex")

m2

As described.

c) 12.5mm Plasterboard "Fireshield"

m2

As described.

d) 37.5mm Plasterboard (Insulated-Kooltherm K17)

m2

As described.

(Timber Stud Partitions Walls)

 

 

a) Standard 12.5mm Plasterboard / Skimming (single side)

m2

As described.

(Sound Insulation - Wall & Ceilings)

 

 

a) 100mm Mineral Wool Sound Insulation (Ceilings)

m2

As described.

b) 50mm Multi Purpose Acoustic Mat (Partition Walls)

m2

As described.

(Dry Lining Walls - dot & dab)

 

 

a) Standard 12.5mm Plasterboard

m2

As described.

(Float & Skim Walls)

 

 

a) Standard 11mm Base & 2mm Top Coat

m2

As described.

(Gyproc Cove)

 

 

a) Plain 127mm

m2

As described.

(Plain Face Render)

 

 

a) Standard 6mm base & 6mm Top Coat 4-1 Mix

m2

As described "scaffolding assumed to be supplied by main contractor".

(Beading)

 

 

a) Thincoat Beads

Lm

As described.

b) Angle Beads

Lm

As described.

c) Bellcast Beads

Lm

As described.

d) Stop Beads

Lm

As described.

Addition

 

 

a) Plaster Patching To Existing

item

As described.

 

 

 

6 Floor Screed

 

 

a) 65mm Screed (1:5 mix ratio)

m2

As described.

b) 75mm Screed (1:5 mix ratio)

m2

As described.

c) Insulation (see floor slab above)

 

As described.

a)

m2

As described.

 

 

 

7 Heating - PC Sum

rate

As described." note ²F rate"

 

 

 

8 Plumbing - PC Sum

rate

As described." note ²F rate"

 

 

 

9 Electrical - PC Sum

rate

As described." note ²F rate"

 

 

 

10 Supply & Fix Wall/Floor Tiles - PC Sum or Not Included

rate

As described.

 

 

 

11 Supply & Fit Kitchen Units - PC Sum or Not Included

rate

As described.

 

 

 

12 Supply Of Sanitary Ware - PC Sum or Not Included

rate

As described.

 

 

 

13 Internal / External Decoration PC Sum or Not Included

rate

As described.

 

 

 

14 Addition

rate

Any additional trade or trades not included above.

 

 

 

15 Builders Associated Work

rate

Any additional work associated with Sub-Contractors i.e. lifting floor boards / chasing in / grooving / pointing / making good after etc.

 

 

 

Description

Unit

Summary

C General Terminology

 

 

1) Preliminaries

item

A cost inserted by the Main Contractor to cover general site running costs not itemized i.e. Site Set Up / Delivery Of Materials / Supervision / Mobile Phones / Vehicle / Welfare / Storage / Skips For General Rubbish / Small Tools/ Final Clean etc."Adjust allowance to suit each individual contract.".

2) Contingency

item

A cost inserted by the Main Contractor to cover any unforeseen event / problem / expense that might arise unexpectedly."Adjust allowance to suit each individual contract."

3) Overheads & Profit

item

Main Contractors general business running costs & excess of income over expenditure."Adjust allowance to suit each individual contract."

4) PC Sum / Provisional Sums

item

A sum of money inserted into a contract to cover the estimated cost of a specific item of work. This money may or may not be spent under the contract.

5) Additions

item

Any additional materials / tool-plant hire / skips / work-works / trade-trades or any other items required that are not included within this schedule. "to be assess and quantified."

6) m2 or M2

item

Square Meter.

7) Lm

item

Linear Meter. (straight line)

8) m3 or M3

item

Meter Cube.

9) m or M

item

Meter.

10) "

item

inch

11) ²F

item

Square Foot. (imperial measure)

12) no

item

Number.

13) hr

item

Hour.

14) hrs

item

Hours.

15) kg

item

Kilogram.

16) £

item

Pounds Sterling.(British currency)

17) yrd

item

Yard. (imperial measure)

 

 

 

Description

Unit

Summary

D General Notes

 

 

1) Skips

note

Less skips may be required than indicated if finer none-bulking material loaded.